The client required assistance with Capital Expenditure to site over a 3 year period.
The GMP Group project managed the Capital Expenditure, which included design, cost planning, project delivery, health and safety, and validation. The GMP Group assisted with 3 FDA. 1 MHRA and 2 ISO Inspections, as well as numerous internal QA audits.
The assistance that we provided in the audits and inspections meant that the client successfully met with the necessary regulations, without issue. The client was therefore satisfied with the outcome.